What Kepler does
Solar Forecast EAI sets a PV budget over a shared period and distributes it in a fixed priority order: first household demand, then the heat pump, then the storage reserve, then a safety reserve guided by how reliable your forecast is – and what is left after that goes to the wallbox. Each step shows what it needs, what it gets from PV, and what is still in the budget afterwards. One period, one order, no competition.
For the heat pump, Kepler calculates the electrical demand for the next 72 hours, with an uncertainty band and the drivers behind it: outdoor temperature, domestic-hot-water cycle, building inertia. And it explains its recommendation: “Why exactly this time window? PV generation exceeds household base load, heat-pump demand, and storage reserve at the same time.” With a confidence value, with uncertainty, in sentences.